Outils pour utilisateurs

Outils du site


p9-santander-city-council-es

Ceci est une ancienne révision du document !


Good Practices Register

P9 Santander City Council (SP)

Contact person

GP 9-1

Good practice #9-1PPP Contract for the street lighting upgrade in Santander
Main institution involved (not available)
Field:
Energy monitoring Financial monitoring X
Location Santander, Cantabria, Spain
Streetlight
Timescale 2012
Good practices categories
1-Good Practice measurement (hardware) X 5-Good data (energy and/or financial) collections system
2-Good software X 6-Good energy and/or financial indicators and/or ergonomy
3-Good financial tools X 7-Good data analysing system X
4-Good organisation and managementX 8-Good use of data X
Abstract or SummaryIn December 2012, the EEEF signed its first Technical Assistance contract with the City Council of Santander for over €450K to conduct feasibility studies to review energy performance of the current public infrastructure and to elaborate a plan to improve the energy efficiency of the City.
The scope of work included the completion of energy audits within 65 municipal buildings and of 22,700 street lighting points. Based on the results of the energy audits, the City Council took the decision to renovate the street lighting infrastructure and published a call for tender to select a private company to upgrade and maintain it.
According to the PPP contract, the selected energy service company is required to invest €11m to upgrade over almost 23,000 lighting points in Santander. The project include the:
 Upgrade of current lamps to cutting edge LED lighting technology,
 Inclusion of point-to-point remote management,
 Installation of 60 motion lighting sensors, to ensure illumination intensity regulation.
Financial schemePPP
Further informations(web)
Contact details(not available)
Long description(not available)
Pictures, videos

GP 9-2

Good practice #9-2ESCO Contract for 5 schools in Madrid Municipality
Main institution involved Municipality of Madrid
Field:
Energy monitoringX Financial monitoring
Location Madrid, Madrid, Spain
5 schools
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) 5-Good data (energy and/or financial) collections system X
2-Good software 6-Good energy and/or financial indicators and/or ergonomy X
3-Good financial tools X 7-Good data analysing system X
4-Good organisation and managementX 8-Good use of data X
Abstract or SummaryThe purpose is gain benefits in Water and energy supplies, energy services and fully guaranteed maintenance.
It includes air conditioning, domestic hot water (ACS), indoor and outdoor lighting, plumbing and building envelopes in the energy consumer centre integrated by the buildings and equipments of 5 schools of the City council from Madrid.
The contractor carried out the measures and verifications of the savings following the methodology IPMVP (International Performance Measurement & Verification Protocol) and by an EVO certified technician (Efficiency Valuation Organization) or an European Energy Manager (EUREM) Certified by the Eurem network.
Financial schemeESCO
Further informations(web)
Contact details(not available)
Long description(not available)
Pictures, videos

GP 9-3

Good practice #9-2Renovation of 10 nursing homes old oil boilers by new gas boilers
Main institution involved Regional government of Madrid
Field:
Energy monitoringX Financial monitoring
Location Madrid, Madrid, Spain
Nursing homes
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) 5-Good data (energy and/or financial) collections system X
2-Good software 6-Good energy and/or financial indicators and/or ergonomy X
3-Good financial tools X 7-Good data analysing system X
4-Good organisation and managementX 8-Good use of data X
Abstract or SummaryThis initiative was launched by the Regional Government of Madrid to renovate old oil boilers existing in the larger nursing homes existing in the region, and substitute them by new gas boilers with higher energy efficiency and reducing the energy costs.
This helped both to the development of more efficient installations and the gas grid around the region. An energy audit was developed to detect the energy consumption, the original situation of the heating systems and the technical possibilities to substitute the boilers and use solar thermal heat.
The Regional Government used the budget available from previous energy related measures to start the projects of new boilers installation, prioritizing those with better financing numbers (pay-back and cost savings).
Financial scheme(not available)
Further informations(web)
Contact details(not available)
Long description(not available)
Pictures, videos
p9-santander-city-council-es.1518107474.txt.gz · Dernière modification: 2018/02/08 17:31 de 78.239.94.33