Outils pour utilisateurs

Outils du site


p2-local-energy-management-agency-of-almada-ageneal-pt

Différences

Ci-dessous, les différences entre deux révisions de la page.

Lien vers cette vue comparative

Les deux révisions précédentes Révision précédente
Prochaine révision
Révision précédente
p2-local-energy-management-agency-of-almada-ageneal-pt [2018/02/07 17:58]
78.239.94.33
p2-local-energy-management-agency-of-almada-ageneal-pt [2018/02/07 22:24] (Version actuelle)
78.239.94.33
Ligne 1: Ligne 1:
 +[[good-practice-register|Good Practices Register]]
 +
 =====P2 Local Energy Agency of Almada (PT)===== =====P2 Local Energy Agency of Almada (PT)=====
  
 ====GP2-1==== ====GP2-1====
  
-^Good practice #2-1|Pilot experience in social housing: Intelligent monitoring of energy consumption||| +^{{:csm_empower_67d8500087.png?nolink&100|}}Good practice #2-1|Pilot experience in social housing: Intelligent monitoring of energy consumption||| 
 |||| ||||
 ^Main institution involved| (if available) ||| ^Main institution involved| (if available) |||
 |||| ||||
 ^Field:|||| ^Field:||||
-^Energy monitoring|X ^Financial monitoring ||+^Energy monitoring|X ^Financial monitoring | |
 |||| ||||
 ^Location| Almada, Portugal ||| ^Location| Almada, Portugal |||
 ^:::| Multiapartment building used for social housing||| ^:::| Multiapartment building used for social housing|||
 |||| ||||
-^Timescale| (if available)|||+^Timescale| 2012-2016|||
 |||| ||||
 ^Good practices categories|||| ^Good practices categories||||
Ligne 37: Ligne 39:
 ====GP2-2==== ====GP2-2====
  
-^Good practice #2-2|Almada’s Climate Fund||| +^{{:csm_empower_67d8500087.png?nolink&100|}}Good practice #2-2|Almada’s Climate Fund||| 
 |||| ||||
 ^Main institution involved| City of Almada ||| ^Main institution involved| City of Almada |||
Ligne 65: Ligne 67:
 |||| ||||
 ^Long description| Between 2009 and 2016 it deployed roughly 1,6 M€ of investment, avoiding the emission of 953 tCO2/year, though the reduction of 3 000 000 kWh (corresponding to a saving of 375 000 €/year on energy costs). Examples of measures implemented are, among other: \\   Telemanagement system for the public lighting in Almada\\  LED lighting on all traffic lights and tests in Public Lighting\\  Energy efficient lighting and HVAC systems in municipal buildings\\  Electric vehicles for the municipal fleet\\  Efficient lighting in historical monuments\\  Efficient lighting in schools\\  Solar PV on municipal buildings\\  Energy retrofitting of social housing buildings\\  Envelope refurbishment in office buildings\\ \\ One of the most important innovations of the fund is the ‘shared benefits’ approach which assumes different sharing schemes between the fund and the “beneficiary department”, based on the characteristic of the project and during its lifetime. The main assumptions and objectives are to ensure the sustainability and the leverage effect of the fund, automatically prioritising the most cost-benefit projects and to directly help the “beneficiary department”.\\ The new revolving methodology, already formally approved and under evaluation in three implemented projects, will make the savings more visible since:\\  they will become part of the budgets of the involved departments;\\  it will make monitoring continuous and more effective since the efficient operation of the projects has direct and visible impacts on the department’s budget;\\  it ensures locking in of investment on energy efficiency and renewable energy;\\  Improved governance for a low carbon development, making the strategic objectives for energy efficiency less dependent of political changes/orientation||| ^Long description| Between 2009 and 2016 it deployed roughly 1,6 M€ of investment, avoiding the emission of 953 tCO2/year, though the reduction of 3 000 000 kWh (corresponding to a saving of 375 000 €/year on energy costs). Examples of measures implemented are, among other: \\   Telemanagement system for the public lighting in Almada\\  LED lighting on all traffic lights and tests in Public Lighting\\  Energy efficient lighting and HVAC systems in municipal buildings\\  Electric vehicles for the municipal fleet\\  Efficient lighting in historical monuments\\  Efficient lighting in schools\\  Solar PV on municipal buildings\\  Energy retrofitting of social housing buildings\\  Envelope refurbishment in office buildings\\ \\ One of the most important innovations of the fund is the ‘shared benefits’ approach which assumes different sharing schemes between the fund and the “beneficiary department”, based on the characteristic of the project and during its lifetime. The main assumptions and objectives are to ensure the sustainability and the leverage effect of the fund, automatically prioritising the most cost-benefit projects and to directly help the “beneficiary department”.\\ The new revolving methodology, already formally approved and under evaluation in three implemented projects, will make the savings more visible since:\\  they will become part of the budgets of the involved departments;\\  it will make monitoring continuous and more effective since the efficient operation of the projects has direct and visible impacts on the department’s budget;\\  it ensures locking in of investment on energy efficiency and renewable energy;\\  Improved governance for a low carbon development, making the strategic objectives for energy efficiency less dependent of political changes/orientation|||
 +||||
 +^Pictures, videos|(if available)|||
 +
 +====GP2-3====
 +
 +^{{:csm_empower_67d8500087.png?nolink&100|}}Good practice #2-3|Telemanagement of public lighting systems - EcoEnlight||| 
 +||||
 +^Main institution involved| City of Almada |||
 +||||
 +^Field:||||
 +^Energy monitoring|X ^Financial monitoring |X|
 +||||
 +^Location| Almada, Portugal |||
 +^:::| Public lighting infrastructures|||
 +||||
 +^Timescale| 2011-2013|||
 +||||
 +^Good practices categories||||
 +^1-Good Practice measurement (hardware) |X^ 5-Good data (energy and/or financial) collections system |X |
 +^2-Good software |X ^ 6-Good energy and/or financial indicators and/or ergonomy | X|
 +^3-Good financial tools | ^ 7-Good data analysing system |X |
 +^4-Good organisation and management| X^ 8-Good use of data | |
 +
 +
 +^Abstract or Summary|The system is based on the use of efficient control and command equipment based on information and communication technologies (ICT) which contribute for a significant reduction of energy consumption as a result of optimized management of public lighting equipment. |||
 +||||
 +^Financial scheme|(if available)|||
 +||||
 +^Further informations|(web page)|||
 +||||
 +^Contact details|name of the organisation or  partner, email, phone... where any interested can get more detailed info about the GP|||
 +||||
 +^Long description| The EcoEnLight project was implemented by the municipality of Almada between 2011 and 2013.  This project was focused on improving the energy efficiency of Almada’s public lighting system, which accounts for more than 60% of the municipality’s energy consumption. During the EcoEnLight project, a smart tele-management system for Almada’s public lighting system was procured and implemented. This tele-management system allows to remotely manage public lighting intensity in Almada by adjusting the luminous flux of all the lights throughout the day. This way, a more efficient and tailored energy consumption coming from the public lighting system can be ensured, which fully takes into account the needs of the citizens who use Almada’s roads during day and night.  Thanks to the EcoEnLight project, the city has been able to reduce the energy needs for public lighting by roughly 40%. This represents a reduction of nearly 0.6 GWh and 300 tons of CO2eq. The savings estimations, which include maintenance and electricity cost savings, pointed to an average of €80,000/year. More than €464,000 were invested in the EcoEnLight project in total. Roughly 1500 light points were refurbished which means roughly 5% of all the public lighting in Almada. The success of the EcoEnlight approach led to the development of the EcoEnlight II project which is currently under preparation and on the pipeline for financing of 3335 light points (this time adding to the tele-management system the replacement of lamps to LED lighting). An overall investment of roughly €1,500,000 for an annual saving of €170,000 and a payback period of 8 years.  At the end of this intervention more than 15% of the public lighting in Almada will be highly efficient.|||
 |||| ||||