Ci-dessous, les différences entre deux révisions de la page.
Les deux révisions précédentes Révision précédente Prochaine révision | Révision précédente | ||
monitoring-solution-pyrenees-atlantiques-department [2017/03/13 13:56] 93.17.233.98 |
monitoring-solution-pyrenees-atlantiques-department [2017/03/13 14:03] 93.17.233.98 |
||
---|---|---|---|
Ligne 37: | Ligne 37: | ||
===== conclusion ===== | ===== conclusion ===== | ||
- | The energy monitoring allows us to better control our consumption and better understand the behavior of buildings. However, a period of 3 years of operation will certainly be necessary to obtain a complete results of the approach. We conduct studies in parallel to obtain the energy signatures of our main sites. Our objective is to renegotiate all operating contracts by the end of 2017 in order to switch to profit-sharing operating contracts. | + | The energy monitoring allows us to have a better control our consumption and better understand the behavior of buildings. However, a period of 3 years of operation will certainly be necessary to obtain a complete results of the approach. We conduct studies in parallel to obtain the energy signatures of our main sites. Our objective is to renegotiate all operating contracts by the end of 2017 in order to switch to profit-sharing operating contracts. |
+ | ==== Source ==== | ||
+ | http:// |