Ci-dessous, les différences entre deux révisions de la page.
Les deux révisions précédentes Révision précédente Prochaine révision | Révision précédente | ||
p7-mazovia-energy-agency-mae-pl [2018/02/08 13:17] 93.17.233.98 |
p7-mazovia-energy-agency-mae-pl [2018/02/08 13:26] (Version actuelle) 93.17.233.98 |
||
---|---|---|---|
Ligne 27: | Ligne 27: | ||
- | ^Abstract or Summary| EINSTEIN is an EU funded project realized by MAE with 7FP contribution. The concept of the project was to assemble equipment for the acquisition and use of renewable energy in a whole year cycle (STES container, solar collector, district heating system, heat pump). The existing conditions in pilot buildings were taken into account. On those basis guidelines for upgrading to reduce energy consumption in accordance with the most stringent environmental requirements have been proposed. Within 48 months of project the Provincial Hospital for Nervous and Mental Illness “Drewnica” in the town of Ząbki gained the low-energy heating system consisting of: | + | ^Abstract or Summary| EINSTEIN is an EU funded project realized by MAE with 7FP contribution. The concept of the project was to assemble equipment for the acquisition and use of renewable energy in a whole year cycle (STES container, solar collector, district heating system, heat pump). The existing conditions in pilot buildings were taken into account. On those basis guidelines for upgrading to reduce energy consumption in accordance with the most stringent environmental requirements have been proposed. Within 48 months of project the Provincial Hospital for Nervous and Mental Illness “Drewnica” in the town of Ząbki gained the low-energy heating system consisting of:\\ • Very low primary energy consumption due to the use of renewable energy sources and energy storage technologies. Reducing primary energy consumption by 70%, compared to the original building' |
- | • Very low primary energy consumption due to the use of renewable energy sources and energy storage technologies. Reducing primary energy consumption by 70%, compared to the original building' | + | |
- | • Heat pumps used as an efficient source of energy, working even with COP = 10. | + | |
- | • Renewable energy sources (151m2 net surface of solar collectors) | + | |
- | • Combination of STES and heat pumps, resulting in up to 20% energy efficiency increase, 35% reduction in primary energy consumption and 25% reduction in energy costs. | + | |
- | ||| | + | |
|||| | |||| | ||
^Financial scheme|(not available)||| | ^Financial scheme|(not available)||| | ||
Ligne 112: | Ligne 107: | ||
^Pictures, videos| ||| | ^Pictures, videos| ||| | ||
+ | ====GP 7-4 ==== | ||
+ | ^{{: | ||
+ | |||| | ||
+ | ^Main institution involved|Water Supply and Sewerage Company in Otwock||| | ||
+ | |||| | ||
+ | ^Field:|||| | ||
+ | ^Energy monitoring|X ^Financial monitoring | | | ||
+ | |||| | ||
+ | ^Location| Otwock, Mazovia Region ||| | ||
+ | ^:::|Water Supply and Sewerage Company ||| | ||
+ | |||| | ||
+ | ^Timescale| (not available)||| | ||
+ | |||| | ||
+ | ^Good practices categories|||| | ||
+ | ^1-Good Practice measurement (hardware) | ^ 5-Good data (energy and/or financial) collections system |X | | ||
+ | ^2-Good software | ^ 6-Good energy and/or financial indicators and/or ergonomy |X | | ||
+ | ^3-Good financial tools | ^ 7-Good data analysing system |X | | ||
+ | ^4-Good organisation and management|X ^ 8-Good use of data |X | | ||
+ | |||
+ | |||
+ | |||
+ | ^Abstract or Summary|With the use of norm ISO 50001, which purpose is to provide support with creating the systems necessary to improve the energy economy, including energy efficiency and energy consumption in organizations, | ||
+ | |||| | ||
+ | ^Financial scheme|(not available)||| | ||
+ | |||| | ||
+ | ^Further informations|(web)||| | ||
+ | |||| | ||
+ | ^Contact details|(not available)||| | ||
+ | |||| | ||
+ | ^Long description|||| | ||
+ | |||| | ||
+ | ^Pictures, videos| ||| | ||
+ | |||
+ | ====GP 7-5 ==== | ||
+ | |||
+ | ^{{: | ||
+ | |||| | ||
+ | ^Main institution involved| Municipality of Karczew||| | ||
+ | |||| | ||
+ | ^Field:|||| | ||
+ | ^Energy monitoring|X ^Financial monitoring |X | | ||
+ | |||| | ||
+ | ^Location| Karczew, Mazovia Region, Poland ||| | ||
+ | ^::: | ||
+ | |||| | ||
+ | ^Timescale| (not available)||| | ||
+ | |||| | ||
+ | ^Good practices categories|||| | ||
+ | ^1-Good Practice measurement (hardware) | ^ 5-Good data (energy and/or financial) collections system |X | | ||
+ | ^2-Good software | ^ 6-Good energy and/or financial indicators and/or ergonomy |X | | ||
+ | ^3-Good financial tools | X^ 7-Good data analysing system |X | | ||
+ | ^4-Good organisation and management|X ^ 8-Good use of data |X | | ||
+ | |||
+ | |||
+ | |||
+ | ^Abstract or Summary|Karczew, | ||
+ | |||| | ||
+ | ^Financial scheme|PPP||| | ||
+ | |||| | ||
+ | ^Further informations|(web)||| | ||
+ | |||| | ||
+ | ^Contact details|(not available)||| | ||
+ | |||| | ||
+ | ^Long description|||| | ||
+ | |||| | ||
+ | ^Pictures, videos| ||| | ||
+ | |||
+ | ====GP 7-6 ==== | ||
+ | |||
+ | ^{{: | ||
+ | |||| | ||
+ | ^Main institution involved| MAE||| | ||
+ | |||| | ||
+ | ^Field:|||| | ||
+ | ^Energy monitoring|X ^Financial monitoring | | | ||
+ | |||| | ||
+ | ^Location| | ||
+ | ^:::| ||| | ||
+ | |||| | ||
+ | ^Timescale| (not available)||| | ||
+ | |||| | ||
+ | ^Good practices categories|||| | ||
+ | ^1-Good Practice measurement (hardware) |X ^ 5-Good data (energy and/or financial) collections system |X | | ||
+ | ^2-Good software |X ^ 6-Good energy and/or financial indicators and/or ergonomy |X | | ||
+ | ^3-Good financial tools | ^ 7-Good data analysing system | | | ||
+ | ^4-Good organisation and management| ^ 8-Good use of data | | | ||
+ | |||
+ | |||
+ | |||
+ | ^Abstract or Summary|MAE has created a project that assists local government units to fulfill their obligations under the Energy Efficiency Act. The main structure of the project is an expert team which, based on software specially prepared for energy monitoring, has taken over some of the statutory responsibilities for energy management from local governments. This team works within the Mazovian Center for Energy Management (MAE unit). | ||
+ | |||| | ||
+ | ^Financial scheme|(not available)||| | ||
+ | |||| | ||
+ | ^Further informations|(web)||| | ||
+ | |||| | ||
+ | ^Contact details|(not available)||| | ||
+ | |||| | ||
+ | ^Long description|||| | ||
+ | |||| | ||
+ | ^Pictures, videos| ||| |