Good Practices Register

P7 Mazovia Energy Agency MAE (PL)

Contact person

GP 7-1

Good practice #7-1EINSTEIN
Main institution involved Mazovia Energy Agency MAE
Field:
Energy monitoringX Financial monitoring
Location Ząbki, Mazovia Region, Poland
Hospital campus
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) 5-Good data (energy and/or financial) collections system
2-Good software 6-Good energy and/or financial indicators and/or ergonomy X
3-Good financial tools 7-Good data analysing system
4-Good organisation and managementX 8-Good use of data X
Abstract or Summary EINSTEIN is an EU funded project realized by MAE with 7FP contribution. The concept of the project was to assemble equipment for the acquisition and use of renewable energy in a whole year cycle (STES container, solar collector, district heating system, heat pump). The existing conditions in pilot buildings were taken into account. On those basis guidelines for upgrading to reduce energy consumption in accordance with the most stringent environmental requirements have been proposed. Within 48 months of project the Provincial Hospital for Nervous and Mental Illness “Drewnica” in the town of Ząbki gained the low-energy heating system consisting of:
• Very low primary energy consumption due to the use of renewable energy sources and energy storage technologies. Reducing primary energy consumption by 70%, compared to the original building's pre-modernization situation, allows the design of new low-energy buildings
• Heat pumps used as an efficient source of energy, working even with COP = 10.
• Renewable energy sources (151m2 net surface of solar collectors)
• Combination of STES and heat pumps, resulting in up to 20% energy efficiency increase, 35% reduction in primary energy consumption and 25% reduction in energy costs.
Financial scheme(not available)
Further informations(web)
Contact details(not available)
Long description(not available)
Pictures, videos

GP 7-2

Good practice #7-2Jessica
Main institution involved Municipalities of Mazovia Region
Field:
Energy monitoring Financial monitoring X
Location Mazovia Region, Poland
Energy project from cities only
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) 5-Good data (energy and/or financial) collections system
2-Good software 6-Good energy and/or financial indicators and/or ergonomy
3-Good financial tools X 7-Good data analysing system
4-Good organisation and managementX 8-Good use of data
Abstract or Summary JESSICA initiative allows to use the European Union structural funds to make a return investments in integrated urban projects included in local strategic documents. Unlike grants, it offers a significantly wider range of financial instruments, including contributions, loans or guarantees, to provide a better and more comprehensive response to urban investment needs. Projects implemented with the support of JESSICA Initiative should generate revenue. In Poland JESSICA is implemented regionally in the framework of Regional Operational Programs (ROP). Examples of types of projects include:
• construction, development and modernisation of renewable energy sources infrastructure
• construction, extension and modernisation of infrastructure used to transfer and distribute the energy
• construction, extension and modernisation of heating systems energy efficiency)
• conversion of existing heating systems in public utility buildings to more environmentally friendly
• thermomodernisation of buildings

18 projects in the Region were supported (ca. 18,5 mio EUR in loans).
Financial scheme(not available)
Further informations(web)
Contact details(not available)
Long description
Pictures, videos

GP 7-3

Good practice #7-3Local Energy Manager (LEM) studies
Main institution involved MAE
Field:
Energy monitoringX Financial monitoring
Location Warsaw, Mazovia Region, Poland
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) 5-Good data (energy and/or financial) collections system
2-Good software 6-Good energy and/or financial indicators and/or ergonomy
3-Good financial tools 7-Good data analysing system
4-Good organisation and managementX 8-Good use of data
Abstract or SummaryMAE in collaboration with Higher School of Ecology and Management started postgraduate studies “Local Energy Manager - LEM”, which are addressed to local government officials, employees or candidates for employees for municipal offices and organizational units of local self-government of the Mazovia Region as well as municipal enterprises. The aim of postgraduate studies is to acquire and develop legal, technical, economic, organizational and environmental knowledge of the production, distribution, storage, monitoring and marketing of conventional and renewable energy, as well as energy security at local level, including primarily planning, management and financing of energy in the municipality. MAE managed to successfully finish three edition of postgraduate studies with high interest of local governments and enterprises.
3 years of studies completed, ca. 150 graduates.
Financial scheme(not available)
Further informations(web)
Contact details(not available)
Long description
Pictures, videos

GP 7-4

Good practice #7-4Energy Management System in water company
Main institution involvedWater Supply and Sewerage Company in Otwock
Field:
Energy monitoringX Financial monitoring
Location Otwock, Mazovia Region
Water Supply and Sewerage Company
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) 5-Good data (energy and/or financial) collections system X
2-Good software 6-Good energy and/or financial indicators and/or ergonomy X
3-Good financial tools 7-Good data analysing system X
4-Good organisation and managementX 8-Good use of data X
Abstract or SummaryWith the use of norm ISO 50001, which purpose is to provide support with creating the systems necessary to improve the energy economy, including energy efficiency and energy consumption in organizations, Water Supply and Sewerage Company in Otwock implemented strategy of “Energy management system”. The main reason for developing such a strategy were rising prices of electricity and heat, which increase the cost of operating the company. It has become very important to identify and eliminate loss related to energy use and use energy from renewable sources. In the case of Otwock, this is the biogas generated during the stabilization of sewage sludge in the methane fermentation process of sludge generated by the treatment of municipal sewage.
The results of strategy each year provides savings.
Financial scheme(not available)
Further informations(web)
Contact details(not available)
Long description
Pictures, videos

GP 7-5

Good practice #7-5PPP in thermo-modernization of public utility facilities
Main institution involved Municipality of Karczew
Field:
Energy monitoringX Financial monitoring X
Location Karczew, Mazovia Region, Poland
Schools, kindergartens, health centres
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) 5-Good data (energy and/or financial) collections system X
2-Good software 6-Good energy and/or financial indicators and/or ergonomy X
3-Good financial tools X 7-Good data analysing system X
4-Good organisation and managementX 8-Good use of data X
Abstract or SummaryKarczew, a town located in the immediate vicinity of Warsaw, has implemented a project aimed at more efficient management of heat and electricity. The project was implemented by Siemens in the form of Public-Private Partnerships. The goal of the project was to achieve savings by monitoring the consumption of heat and electricity, improving the aesthetics of buildings and improving the energy management system. The scope of the project covered the thermo-modernization of 10 public buildings: schools and kindergartens and health centers. Modernization of the heating system in individual buildings consisted in changing the way of supplying the system from coal to gas or from electric to district heating. An energy monitoring system was used in the buildings. The most important results of the thermo-modernization work are the guaranteed savings of 56% for thermal energy and 20.9% for electricity. Verification of achieved savings is made every year after each heating season.
Financial schemePPP
Further informations(web)
Contact details(not available)
Long description
Pictures, videos

GP 7-6

Good practice #7-6Mazovian Center for Energy Management
Main institution involved MAE
Field:
Energy monitoringX Financial monitoring
Location Mazovia Region, Poland
Timescale (not available)
Good practices categories
1-Good Practice measurement (hardware) X 5-Good data (energy and/or financial) collections system X
2-Good software X 6-Good energy and/or financial indicators and/or ergonomy X
3-Good financial tools 7-Good data analysing system
4-Good organisation and management 8-Good use of data
Abstract or SummaryMAE has created a project that assists local government units to fulfill their obligations under the Energy Efficiency Act. The main structure of the project is an expert team which, based on software specially prepared for energy monitoring, has taken over some of the statutory responsibilities for energy management from local governments. This team works within the Mazovian Center for Energy Management (MAE unit). The project provides complete energy consumption monitoring and ongoing online access to both batch data and reports supporting the management of energy consumption in public facilities.
Financial scheme(not available)
Further informations(web)
Contact details(not available)
Long description
Pictures, videos